UL Listed Factory Copper Cable Price Wire Manufacturing Lead

UL approval factory copper cable prices electric wire manufacture lead wire★Rated temperature:125ºC★Rated voltage:300V★According to:UL Subject758,UL1581,C22.2★Solid or stranded,tinned or bare copper conductor 32--10AWG★XLPE insulation★Passes UL VW-1&CSA FT1 vertical flame test&nb

Featured Products


UL Approval Factory Copper Cable Prices Electric Wire Manufacture Lead Wire
UL approval factory copper cable prices electric wire manufacture lead wire

UL Approval Factory Copper Cable Prices Electric Wire Manufacture Lead Wire

★Rated temperature:125ºC
Rated voltage:300V
★According to:UL Subject758,UL1581,C22.2
★Solid or stranded,tinned or bare copper conductor 32--10AWG
★XLPE insulation
★Passes UL VW-1&CSA FT1 vertical flame test 
★Uniform insulation thickness of wire to ensure easy stripping and cutting
★For general purpose internal wiring of appliance

 
 ConductorFinished productMaximum Resistance at 20ºC
AWGNO.of CondInsulation Thick.Outside Thick.Packing
No./mmmmmmm/rΩ/mm
307/0.10.411.10610354.33
287/0.1270.411.20610223.75
267/0.160.411.30610139.76
2411/0.160.411.4061088.36
2217/0.160.411.6061060.16
2021/0.1780.411.8061038.58
1834/0.1780.412.1061022.98
1626/0.2540.412.4061015.06
281/0.3200.411.15610227.39
261/0.4040.411.25610142.79
241/0.5110.411.3561089.39
221/0.6430.411.5061054.30
201/0.8130.411.6561033.90
181/1.0240.411.8561021.40


UL Approval Factory Copper Cable Prices Electric Wire Manufacture Lead Wire
UL Approval Factory Copper Cable Prices Electric Wire Manufacture Lead Wire
UL Approval Factory Copper Cable Prices Electric Wire Manufacture Lead Wire

Q1: Can I get a free sample?
A1: We can provide the existing items samples free in freight collected. If there is any special samples requirement, please contact us for more details.


Q2: How could I pay?
A2: We prefer T/T or L/C at sight. If you prefer other payment terms, please contact us freely.


Q3: What is your packing way? Can I have the customized package?
A3: We have the standard export package. For more details about the customized package, please contact us.


Q4: What is the delivery lead time?
A4: It depends on the order quantities. The mass production lead time is about 7-12 days after receipt of the deposit.


Q5: Are you a factory or a trading company?
A5: We are a factory. We provide all kinds of OEM/ODM services for clients around the world.


Q6: Where is your main market?
A6: We export to the North America, Southeast Asia, Europe, Korea, Japan, and other countries.


Our Services
1. Professional QC and QA team to make sure all products qualified before shipping.
2. Competitive price

3 .Standard package to ensure the safe transportation.
4. Professional service

Why choose us
1. Production
    Qualified production, competitive price, professional service.

2. Technology
    Professional R& D team
3. Equipment
    With completive testing equipment.

4. Quality
    UL/ CE/ FCC/ RoHS/ Reach certificate


 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours